Contractor for LA County
Plans for Permits

When it comes to drawing plans for permits, you’re creating the formal blueprint package required to obtain approval from building departments. In Los Angeles County—including unincorporated areas and contract cities, plans must be precise, dimensioned, and typically sealed by a licensed architect or engineer for structural or mechanical work.

Quick Summary

For homeowners and condo owners across Los Angeles County, the path to approved plans and permits follows a structured journey:

  1. Determine permit necessity
  2. Draw or obtain accurate plans
  3. Submit plans and application
  4. Navigate plan check process
  5. Pay fees and secure approvals
  6. Schedule inspections
  7. Close out permit and finalize

Silver Moccasin Builders is here to streamline each step—helping with drawing plans for permits, submitting building plans, tracking progress, expediting ADU pre‑approved plans, and minimizing reasons for rejection. Contact us today to get your residential or condo permit journey started.

A living room or sunroom decorated for Christmas, featuring a tall, pre-lit artificial tree flanked by two upholstered armchairs in front of a large window wall.

Building Plans and Permits Process

Step 1

Determine if You Need a Permit

Permits are mandatory for most residential work—including new construction, additions, ADUs, remodels, window/door changes, decks, retaining walls, pools, and electrical/mechanical/plumbing upgrades. The County even offers Express Permits for simple residential projects like water heaters or HVAC replacements, which can be self-issued online through EPIC‑LA.

Step 2

Complete Application & Submit Plans
  • Los Angeles County: Submit via EPIC‑LA (unincorporated areas) or BSOP (contract cities)
  • Pasadena: Use the Permit Center Online to submit subtrade permits for new construction, additions, conversions, and ADUs
  • Glendale: First go through research and design‑review (especially for ADUs or remodels), then apply via Glendale Permits Portal

Step 3

Plan Check & Review

Plans undergo either a quick over‑the‑counter review or a submitted plan check, depending on complexity. Pasadena and Glendale provide pre‑application services and design‑review steps tailored to residential and ADU projects.

Step 4

Approvals & Fees

Once reviewed, your plans need approvals from agencies like water, regional planning, or fire marshall before final permit issuance. Fees include plan check charges at time of submission and permit fees before issuance.

Step 5

Permit Issuance

Permits are issued only after all approvals are secured. In LA County, only licensed contractors, homeowners, or their agents can receive permits.

Step 6

Inspections

After permit issuance, inspections are required at key stages. Permit holders (contractor or homeowner) must request these via EPIC-LA or respective city portals.

Step 7

Project Completion

Once all inspections are passed—and approvals are finalized—a Certificate of Occupancy may be issued for new homes. Permits expire if work doesn’t begin in 12 months or lapses for 180 days.

Submitting Plans for Building Permits: Residential Focus

When working on a home or condo, submitting complete, well‑organized plans is crucial:

Pasadena

Provide site, floor, elevation plans in triplicate plus a labeled PDF. Industrial work requires additional subtrade permits.

Glendale

Start with comprehensive design drawings and photo surveys. Complete-building projects need architectural sets along with planning pre‑screening.

LA County

Small projects (under 400 ft² additions) may qualify for homeowner‑drawn plans; more complex designs need licensed engineer-stamped plans.

Approved Plans and Permits: Why They Matter

“Approved plans and permits” indicate legal and code‑compliant construction. Without them:

Rescale graph Icon

Resale value declines

Insurance Icon

Insurance claims may be denied

Government Icon

Local authorities can impose fines, require demolition, or revoke occupancy

Once inspections are complete and permits are closed out, homeowners may receive a final sign‑off and Certificate of Occupancy or Completion.

Why Permits Matter

Local Variations: Cities We Serve

Below are key highlights for each city:

Altadena, Bradbury, Sierra Madre

Under Los Angeles County jurisdiction—managed via EPIC‑LA/BSOP – same residential rules apply.

Pasadena

Requires comprehensive sets and has Permit Center Online with ADU pre‑approved plans, speeding process.

Glendale

Strict on design-review, requires photo surveys, ADU packages, and utility clearances; offers pre‑approved ADU plans.

Monrovia, Arcadia, San Marino, Alhambra, El Sereno, Beverly Hills, Los Angeles, South Pasadena, Burbank:

Contract cities follow county or have their own building and safety rules, similar to those above. (For brevity, contact your local jurisdiction for nuanced requirements—same structure applies.)

Cost & Time‑Frame

Costs

  • Fees vary based on valuation. Both plan check and permit fees are charged accordingly.
  • Refund policy: 80% refund if no review or work commenced.

Time‑Frame

  • Initial plan check turnaround is roughly two weeks for simple home construction.
  • Express Permits are available online and issued immediately on EPIC‑LA.
  • Full residential plans may take longer, depending on complexity and agency review.

Responsibilities: Contractor vs Homeowner

Contractor
  • For licensed trade work, contractors must apply for permits, submit plans, and request inspections.
  • Only licensed contractors or homeowners (where allowed) can legally pull a permit.

VS

Homeowner
  • May act as own “owner‑builder” for residential projects—can apply, submit plans, pay fees, schedule inspections.

Expediting Plans & Permits

  • Pre‑approved ADU plans in Pasadena and Glendale reduce review time by eliminating design plan check.
  • Express Permits are instantly issued online for eligible residential upgrades.
  • Pre‑application design consultation in Glendale and Pasadena helps identify issues early.
A bright yellow construction hard hat rests on a large sheet of architectural blueprints and floor plans. Two long wooden pencils and the setting sun are visible on the desk surface in the background.

Common Reasons for Rejection

Blueprint Icon

Incomplete plan sets: Missing site plans, dimensioning, photo surveys, or noncompliant details

Measurement Icon

Zoning nonconformance: Setbacks, lot coverage, or height violations

Contract Icon

Lack of required agency approvals: From water utilities, regional planning, or power departments

Stamping Icon

Non‑sealed or unengineered plans: Required for structural, Foundation, or complex mechanical work

A high-angle view of construction tools, including a cordless drill and a measuring tape, on a wooden surface. The tools rest next to a stack of architectural blueprints, a level, screws, and plastic anchors.

Frequently Asked Questions

Fees depend on project valuation and scope. Plan check fees are paid at submission, and permit fees before issuance. An 80% refund is possible if no work has begun

Simple residential plan check may take about 2 weeks. Express Permits are instant. Full plans can take longer depending on design complexity and agency review.

For small home additions (under 400 ft²), homeowner-drawn plans are allowed in LA County. Larger or complex projects require licensed architect or engineer stamped plans .

Licensed contractors must apply for trade work. Homeowners can apply as “owner‑builders” when permitted .

Common causes include design code violations and missing approvals. Pre‑application consultations and ensuring submittals are complete can prevent delays .

Simple residential upgrades like water heaters, HVAC systems, and solar installations are eligible for online Express Permits via EPIC‑LA—issued instantly after payment.